Mine Line have successfully supplied and installed the 2000KVA Loadcentre with 3.3KV Primary and Multiple Secondary drives having various voltages up to 1140V to cater to various requirements for the Continuous miner, Shortwall & Longwall Projects.
The Loadcentre is provided with a complete Automation system from BARTEC GmbH to control & monitor
- Individual Drive Control
- Logical Sequencing
- Control and Configuration through VGA Display and Intrinsically Safe Keyboard & Mouse
- Data Storage of drive configuration and faults
Mine Line had deputed a fleet of Engineers & Technicians to look after these electricals for One Complete year to ensure the smooth running of the project.